
01
Understand the operating cycle
Collect payload, grade, loaded and empty distance, shift pattern, road conditions and destination requirements to define the actual transport cycle.
African Mining Routes
For bauxite, gold, copper, cobalt and mine-to-port heavy transport, operating conditions are defined first, then vehicle, range extension, refuelling and service readiness are matched.
Project evaluation flow

01
Collect payload, grade, loaded and empty distance, shift pattern, road conditions and destination requirements to define the actual transport cycle.

02
Evaluate vehicle class, battery, methanol range extender, protection features and refuelling plan against the working route—not against a generic promise.

03
Align methanol supply, service access, parts planning and driver and technician preparation before mobilisation.

04
Where configured, use vehicle operation, selected fault-condition and energy-use data to support maintenance planning and service response.
WNE does not publish fixed fuel-saving, range, uptime or payback commitments. Every estimate is reviewed against a specific route and operating plan. Page imagery illustrates the project workflow and does not represent a specific customer or an operating project.